LUL - G2549

Signalling and train control systems maintenance

inactive
Organization: LUL
Publication Date: 1 March 2012
Status: inactive
Page Count: 17
scope:

The principles defined within this Guidance document, if adopted for the planning and execution of preventive maintenance, incident management and fault rectification for signalling and train control systems on LU, would satisfy the current requirements of engineering standard E7051. The principles should be applied to new signalling and control systems at all stages of their lifecycle, and to existing systems where applicable.

Purpose

This Guidance document describes a philosophy which can form a basis for the establishment of maintenance procedures and processes, for use on London Underground signalling and train control systems, which will be acceptable to the Professional Head of Signalling. Mandatory requirements for a maintenance strategy are defined within engineering standard E7501.

Document History

January 1, 2017
Signalling and train control systems maintenance
This guidance applies to persons involved in the planning and execution of preventive maintenance, incident management and fault rectification for signalling and train control systems on LU. It would...
G2549
March 1, 2012
Signalling and train control systems maintenance
The principles defined within this Guidance document, if adopted for the planning and execution of preventive maintenance, incident management and fault rectification for signalling and train control...