This document references:
VA 23 05 11 - COMMON WORK RESULTS FOR HVAC
Published by VA
on
November 1, 2010
DESCRIPTION A. The requirements of this Section apply to all sections of Division 23. B. Definitions: 1. Exposed: Piping, ductwork, and equipment exposed to view in finished rooms. 2. Option or...
This document references:
ASME PTC 23 - Atmospheric Water Cooling Equipment
Published by ASME
on
November 10, 2003
This Code provides rules for determining the performance of all referenced cooling equipment with regard to the thermal capability, deviation from design thermal capability, or deviation from design...
This document references:
VA 23 05 11 - COMMON WORK RESULTS FOR HVAC
Published by VA
on
November 1, 2010
DESCRIPTION A. The requirements of this Section apply to all sections of Division 23. B. Definitions: 1. Exposed: Piping, ductwork, and equipment exposed to view in finished rooms. 2. Option or...
This document references:
VA 23 25 00 - HVAC WATER TREATMENT
Published by VA
on
February 1, 2010
DESCRIPTION A. This section specifies cleaning and treatment of circulating HVAC water systems, including the following. 1. Cleaning compounds. 2. Chemical treatment for closed loop heat transfer...
This document is referenced by:
VA 23 05 93 - TESTING, ADJUSTING, AND BALANCING FOR HVAC
Published by VA
on
May 1, 2011
DESCRIPTION A. Testing, adjusting, and balancing (TAB) of heating, ventilating and air conditioning (HVAC) systems. TAB includes the following: 1. Planning systematic TAB procedures. 2. Design Review...