UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L2/TRK/001/MOD13 ISSUE 5

Inspection & Maintenance of Permanent Way: Confirming track is Safe for Selected Linespeed after Work

inactive
Organization: NR
Publication Date: 2 June 2012
Status: inactive
Page Count: 7
scope:

This module applies when inspecting the line in order to:

a) Confirm that engineering work carried out under traffic has been safely completed;

b) Confirm that engineering work carried out when the line is blocked has been safely completed and the line is fit for traffic;

c) raise or remove an emergency or temporary speed restriction (ESR or TSR);

d) raise the permanent line speed (PSR).

This module does not apply to giving up line blockages or removing TSRs that have been imposed solely for the protection of staff.

Document History

September 7, 2019
Inspection & Maintenance of Permanent Way: Track Hand Back; Confirming Track Is Safe for Selected Line Speed after Engineering Work
This module applies when inspecting the line in order to: a) confirm that the track is safe for the passage of trains during and on completion of engineering work carried out under traffic; b)...
September 7, 2015
Inspection & Maintenance of Permanent Way: Confirming Track Is Safe for Selected Line Speed after Work
This module applies when inspecting the line in order to: a) confirm that engineering work carried out under traffic has been safely completed; b) confirm that engineering work carried out with a...
December 1, 2012
Inspection & Maintenance of Permanent Way: Confirming track is Safe for Selected Line speed after Work
This module applies when inspecting the line in order to: a) confirm that engineering work carried out under traffic has been safely completed; b) confirm that engineering work carried out when the...
NR/L2/TRK/001/MOD13 ISSUE 5
June 2, 2012
Inspection & Maintenance of Permanent Way: Confirming track is Safe for Selected Linespeed after Work
This module applies when inspecting the line in order to: a) Confirm that engineering work carried out under traffic has been safely completed; b) Confirm that engineering work carried out when the...

References

Advertisement