UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L2/SIG/19608

Level Crossing Asset Inspection and Implementation of Minimum Action Codes

active, Most Current
Buy Now
Organization: NR
Publication Date: 27 May 2014
Status: active
Page Count: 41
scope:

This process describes a method of inspecting level crossings on Network Rail Managed Infrastructure. It includes:

a) preparing for inspections;

b) undertaking inspections, identifying defects and the minimum actions to be taken on site;

c) recording inspections and defects identified; and

d) managing defect repairs.

It does not apply to authorised walking routes that cross the railway unless they are classified as a staff crossing with white lights. It does not apply to road rail access points or track access points.

Assurance requirements are given in Appendices:

  • A - Annual check that the inspection frequencies in Ellipse are correct
  • B - Checking the quality of repairs to level crossing defects
  • C - Monitoring the timescales for rectifying level crossing defects
  • D - Checking the quality of level crossing inspections

Purpose

This document provides Level Crossing Managers (LCMs) and Delivery Unit staff, see RACI in clause 4, with acceptable means of compliance for the inspection of level crossing assets.

This document assists in the mitigation of the following high level risk:

  • Level Crossings: vehicle, person or animal on the line at risk of collision.

The inspections form part of a multi-disciplinary process that demonstrate that level crossings remain safe, reliable and legally compliant.

Document History

September 4, 2021
Inspection of Level Crossing Systems (aka NR/L2/SIG/19608)
This business process defines the requirements on Route Level Crossing teams and Infrastructure Maintenance Delivery teams for inspection of all level crossing assets on Network Rail managed...
NR/L2/SIG/19608
May 27, 2014
Level Crossing Asset Inspection and Implementation of Minimum Action Codes
This process describes a method of inspecting level crossings on Network Rail Managed Infrastructure. It includes: a) preparing for inspections; b) undertaking inspections, identifying defects and...

References

Advertisement