CSA - N287.6-94
Pre-Operational Proof and Leakage Rate Testing Requirements for Concrete Containment Structures for CANDU Nuclear Power Plants
| Organization: | CSA |
| Publication Date: | 1 January 1994 |
| Status: | inactive |
| Page Count: | 31 |
scope:
This Standard provides the requirements for pre-operational proof tests and leakage rate tests of concrete containment structures of a containment system designed as Class Containment components.
Note: Other components and appurtenances of the containment system may be tested coincident with the tests in this Standard, provided the intent of this Standard is observed and the requirements of CSA Standard CAN/CSA-N285.0 are considered.
Document History