MSFC - NASA MPR 8730.5 REV J
CONTROL OF INSPECTION, MEASURING, AND TEST EQUIPMENT
| Organization: | MSFC |
| Publication Date: | 2 May 2006 |
| Status: | inactive |
| Page Count: | 29 |
scope:
PURPOSE
The purpose of this Marshall Procedural Requirements (MPR) is to establish a comprehensive calibration and metrology program which provides for the management of standards, inspection, measurement, test equipment, and test software in a controlled process. This MPR defines the method and responsibilities for the control of Inspection, Measuring, and Test Equipment (IM&TE) at Marshall Space Flight Center (MSFC) to meet the requirements of NPD 8730.1, "Metrology and Calibration."
APPLICABILITY
This MPR is applicable to all Center organizations and to all onsite contractors performing work under the MSFC Management System.
Document History