UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

ARMY - ADS-63-SP

RADAR SYSTEM AIRWORTHINESS QUALIFICATION AND VERIFICATION REQUIREMENTS

active, Most Current
Organization: ARMY
Publication Date: 11 July 2001
Status: active
Page Count: 17
scope:

This document establishes the verification methods and qualification requirements for radar systems installed on U.S. Army aircraft. A combination of analyses, component testing, ground testing, and flight testing, will verify the design, installations and performance of the radar subsystem prior to the formal Airworthiness Qualification Release. The Airworthiness Qualification program encompasses:

   a. Design reviews.

   b. Engineering design substantiation analyses.

   c. Contractor development and airworthiness qualification tests, including component, subsystem and system testing.

   d. Government systems development and airworthiness qualification testing, including:

      (1) Preliminary Airworthiness Evaluation (PAE).

      (2) Airworthiness and Flight Characteristics Test (A&FC).

e. Government Operational Testing (OT) if required by the approved Test Engineering Master Plan (TEMP).

 

Document History

ADS-63-SP
July 11, 2001
RADAR SYSTEM AIRWORTHINESS QUALIFICATION AND VERIFICATION REQUIREMENTS
This document establishes the verification methods and qualification requirements for radar systems installed on U.S. Army aircraft. A combination of analyses, component testing, ground testing, and...

References

Advertisement