UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NPFC - MIL-PRF-23199/1

PACKAGING, PACKING AND MARKING (PP&M) REQUIREMENTS FOR INSTRUMENTATION AND CONTROL EQUIPMENT

inactive
Buy Now
Organization: NPFC
Publication Date: 28 February 2003
Status: inactive
Page Count: 16
scope:

This specification covers the requirements for packaging, packing, and marking of Instrumentation and Control components to safeguard cleanliness, prevent damage and corrosion, and preserve identification during shipment and storage.

Applicability. This specification is a stand-alone specification that is specific to I&C equipment, and therefore, it is not necessary to refer to the base MIL-PRF-23199 specification. Previous revisions to MIL-PRF-23199 (i.e., MIL-P-23199) referenced levels A, B and C of packaging and packing. This specification eliminates these level designations; thus, any reference to these levels in contractual documents is not applicable. The entire specification should be assumed applicable unless otherwise noted in contractual documents.

Document History

April 4, 2017
PACKAGING, PACKING AND MARKING (PP&M) REQUIREMENTS FOR INSTRUMENTATION AND CONTROL EQUIPMENT
Scope. This specification covers the requirements for packaging, packing, and marking of Instrumentation and Control components to safeguard cleanliness, prevent damage and corrosion, and preserve...
June 14, 2010
PACKAGING, PACKING AND MARKING (PP&M) REQUIREMENTS FOR INSTRUMENTATION AND CONTROL EQUIPMENT
This specification covers the requirements for packaging, packing, and marking of Instrumentation and Control components to safeguard cleanliness, prevent damage and corrosion, and preserve...
MIL-PRF-23199/1
February 28, 2003
PACKAGING, PACKING AND MARKING (PP&M) REQUIREMENTS FOR INSTRUMENTATION AND CONTROL EQUIPMENT
This specification covers the requirements for packaging, packing, and marking of Instrumentation and Control components to safeguard cleanliness, prevent damage and corrosion, and preserve...
July 25, 1997
PACKAGING, PACKING AND MARKING (PP&M) REQUIREMENTS FOR INSTRUMENTATION AND CONTROL EQUIPMENT
This specification covers the requirements for packaging, packing, and marking of Instrumentation and Control components to safeguard cleanliness, prevent damage and corrosion, and preserve...

References

Advertisement