UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

SSPC QP 7

Procedure for Evaluating Painting Contractors With Limited Industrial Work Experience

inactive
Buy Now
Organization: SSPC
Publication Date: 1 May 2003
Status: inactive
Page Count: 6
scope:

The procedure describes a method for evaluating the qualifi cations of fi eld painting contracting fi rms with less than 6 months industrial painting experience. The procedure defi nes minimum requirements for this qualification.

The procedure determines if a painting contractor has the personnel, organization, qualifi cations, procedures, and knowledge to perform surface preparation and coating application of the required quality for complex steel structures under the conditions and restrictions specifi ed by the owner.

The procedure encompasses assessment of resources to perform fi eld application of coatings in the industrial market. Specialty applications, such as lining materials, bituminous products, galvanizing, metallizing, etc., are not covered by the requirements of this standard procedure.

Meeting the requirements of this special qualifi cation program is not equivalent to SSPC certifi cation (e.g., QP 1 or QP 2). Firms meeting requirements of this procedure have not been observed by a qualifi ed auditor performing coating operations in the fi eld on a complex steel structure project.

This procedure qualifi es contractors only for contracts that are specifi cally designated by owners or their representatives as being open to bids from contractors who meet the requirements described below.

Document History

April 9, 2014
Procedure for Evaluating Coating Contractors With Limited Work Experience
This procedure establishes criteria for preliminary qualification of contractors who intend to apply for certification to an industrial or architectural/commercial coating contractor certification...
May 1, 2003
Procedure for Evaluating Painting Contractors With Limited Industrial Work Experience
A description is not available for this item.
SSPC QP 7
May 1, 2003
Procedure for Evaluating Painting Contractors With Limited Industrial Work Experience
The procedure describes a method for evaluating the qualifi cations of fi eld painting contracting fi rms with less than 6 months industrial painting experience. The procedure defi nes minimum...

References

Advertisement