UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

ESD TR5.5-03

Electrostatic Discharge Sensitivity Testing – Very-Fast Transmission Line Pulse (VF-TLP) – Round Robin Analysis

active, Most Current
Buy Now
Organization: ESD
Publication Date: 1 January 2014
Status: active
Page Count: 33
scope:

INTRODUCTION

ESD Association working group 5.5, (ESDA WG 5.5), conducted a round robin (RR) study for the purpose of elevating the current very fast - transmission line pulsing (VF-TLP) standard practice [1] (SP) to a standard test method (STM). The round robin study will demonstrate the precision of the VF-TLP measurement technique when following the ESDA WG5.5 VF-TLP standard practice. This technical report (TR) reviews the RR measurements and analysis used to support the elevation of the VF-TLP document from SP to STM status. It also discusses some of the lessons learned about VF-TLP and the performing of a RR experiment. VF-TLP is defined as TLP testing using pulses of 10 ns or shorter [1]. The analysis of the data was based on ASTM E691, "Standard Practice for Conducting Inter-laboratory Study to Determine the Precision of a Test Method" [2].

This document is divided into 4 sections:

• 1.0 - Introduction

• 2.0 - Measurements

• 3.0 - Analysis of Measurements

• 4.0 - Conclusions

Document History

ESD TR5.5-03
January 1, 2014
Electrostatic Discharge Sensitivity Testing – Very-Fast Transmission Line Pulse (VF-TLP) – Round Robin Analysis
INTRODUCTION ESD Association working group 5.5, (ESDA WG 5.5), conducted a round robin (RR) study for the purpose of elevating the current very fast - transmission line pulsing (VF-TLP) standard...

References

Advertisement