This document references:
5-539 - Verification of Assurance
Published by LUL
on
September 1, 2010
This Standard applies to all LU directorates for all changes, projects or contracts for service delivered by LU, a Supplier, or under an agreement between LU and a Supplier or Third Party, on or...
This document is referenced by:
S1900 - Quality Inspection Completion Certificate (QICC)
Published by LUL
on
July 1, 2023
This standard applies Power equipment, systems and assets for which the LU Head of Power Engineering is accountable. Note: Assets associated with power that may form part of Works such as Civil,...
This document is referenced by:
S2548 - Maintenance of correct side door enable fixed equipment
Published by LUL
on
June 1, 2015
This standard does not include the maintenance of the Platform Automatic Train Communications system (PACS). The primary user of this standard shall be the Asset Steward. This standard supersedes...
This document is referenced by:
G0900 - Quality Inspection Completion Certificate (QICC)
Published by LUL
on
July 1, 2023
This standard applies to Power equipment, systems and assets for which the LU Head of Power Engineering is accountable. Note: Assets associated with power that may form part of Works such as Civil,...
This document is referenced by:
S1209 - TfL Requirements for Systems Engineering Processes
Published by LUL
on
February 1, 2023
This standard applies to TfL and to suppliers contracted to work with TfL Pathway projects / programmes. Note: From here onward project is used, which represents both project and programme. Purpose...