NAVY - UFGS-01 32 16.00 20
SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
| Organization: | NAVY |
| Publication Date: | 1 February 2015 |
| Status: | active |
| Page Count: | 9 |
scope:
NOTE:
This guide specification applies to Design-Bid-Build projects and covers the requirements for the preparation and use of construction schedules for small projects. The small projects covered by this specification may be simple or complex, but would not benefit from the use of a cost-loaded NAS as required by Section 01 32 17.00 20 COST LOADED NETWORK ANALYSIS SCHEDULES (NAS). This specification includes two schedule options to choose from based on the complexity of the project. Edit this specification by choosing the desired scheduling option described below.
Document History