UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NAVY - UFGS-01 32 16.00 20

SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES

active, Most Current
Organization: NAVY
Publication Date: 1 February 2015
Status: active
Page Count: 9
scope:

NOTE:

This guide specification applies to Design-Bid-Build projects and covers the requirements for the preparation and use of construction schedules for small projects. The small projects covered by this specification may be simple or complex, but would not benefit from the use of a cost-loaded NAS as required by Section 01 32 17.00 20 COST LOADED NETWORK ANALYSIS SCHEDULES (NAS). This specification includes two schedule options to choose from based on the complexity of the project. Edit this specification by choosing the desired scheduling option described below.

Document History

August 1, 2018
SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
A description is not available for this item.
August 1, 2018
SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
NOTE: This guide specification applies to Design-Build and Design-Bid-Build projects and covers the requirements for the preparation and use of construction schedules for small projects. The small...
UFGS-01 32 16.00 20
February 1, 2015
SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
NOTE: This guide specification applies to Design-Bid-Build projects and covers the requirements for the preparation and use of construction schedules for small projects. The small projects covered...
Advertisement