This document references:
S1162 - Conductor rail – Performance, design and configuration
Published by LUL
on
September 1, 2021
This standard applies to the conductor rail system. It covers: a) the fundamental design criteria to be met in any new proposal involving the conductor rail system b) requirements to avoid the...
This document references:
S1162 - Conductor rail – Performance, design and configuration
Published by LUL
on
September 1, 2021
This standard applies to the conductor rail system. It covers: a) the fundamental design criteria to be met in any new proposal involving the conductor rail system b) requirements to avoid the...
This document references:
S1622 - Glossary of Terms and Abbreviations
Published by LUL
on
July 1, 2016
This Standard applies to all Category 1, 2 and 5 Standards and the Railway Safety Case (and successor documents). It applies to technical and financial documents where applicable and communications...
This document is referenced by:
S1177 - Track - Managing temperaturedependent risk
Published by LUL
on
March 1, 2022
This standard applies to all LU staff responsible for the installation or maintenance of of track assets. It covers all ballasted flat bottom and bull head track Continuous Welded Rail (CWR), long...
This document is referenced by:
T0435 - Track: Manufacture, assembly and handling of junctionwork
Published by LUL
on
November 1, 2019
This specification applies to the manufacture and dispatch of new P&C for use in LU-controlled infrastructure. It also applies to trial or test panel assemblies where these are required by the...
This document is referenced by:
G3212 - Composite conductor rail installation and maintenance
Published by LUL
on
March 1, 2016
The scope of this Track Handbook is to provide guidance for the methods and tools to be used when working with CCR. It covers the installation of CCR, its insulator supports, ramps, anchors, slipper...
This document is referenced by:
S1158 - Track – Inspection and Maintenance
Published by LUL
on
August 1, 2023
This standard applies to the Permanent Way system in running lines, depots and sidings. It covers, but is not limited to, the following components of track: a) running rails b) check rails c) rail...
This document is referenced by:
S1158 - Track – Inspection and Maintenance
Published by LUL
on
August 1, 2023
This standard applies to the Permanent Way system in running lines, depots and sidings. It covers, but is not limited to, the following components of track: a) running rails b) check rails c) rail...