This document references:
NG TS 2.05 - Technical Specifications - Cable Systems
Published by NG
on
July 1, 2015
PURPOSE AND SCOPE The specifications for new plant, equipment, apparatus and services for use on the National Grid transmission system are contained in a three-level hierarchy of documents. Level 1,...
This document references:
NG SCT 36 - Site Commissioning Tests - Cable Systems
Published by NG
on
April 1, 2011
PURPOSE AND SCOPE This document contains the site commissioning tests and checks to be performed on the installation of a cable system using cables to TS 3.5.1 "132 kV, 275 kV and 400 kV oil-filled...
This document references:
NG SCT 36 - Site Commissioning Tests - Cable Systems
Published by NG
on
April 1, 2011
PURPOSE AND SCOPE This document contains the site commissioning tests and checks to be performed on the installation of a cable system using cables to TS 3.5.1 "132 kV, 275 kV and 400 kV oil-filled...
This document references:
NG TS 2.05 - Technical Specifications - Cable Systems
Published by NG
on
July 1, 2015
PURPOSE AND SCOPE The specifications for new plant, equipment, apparatus and services for use on the National Grid transmission system are contained in a three-level hierarchy of documents. Level 1,...