NR/GN/ELP/27415
Calculation and Analysis of Overhead Contact System Geometry
| Organization: | NR |
| Publication Date: | 5 December 2015 |
| Status: | active |
| Page Count: | 16 |
scope:
This Guidance Note covers the following aspects of Overhead Contact System geometry analysis:
- When analysis is required;
- Parameters required to perform analysis;
- Format and sign convention for Height and Stagger analysis;
- Parameters that require calculation;
- Procedure for analysis.
This Guidance Note applies to all persons responsible for undertaking analysis of Overhead Contact System Geometry on Overhead Line Equipment.
The calculations and princples contained within this document are applicable to all Overhead Contact System designs currently in use on Network Rail controlled infrastructure.
Purpose
This Guidance Note describes the basic Overhead Contact System geometry calculations that are required to demonstrate compliance to the Company Standard NR/L2/ELP/21087Specification of Maintenance of 25kV Overhead LineElectrification Equipment.
Document History