UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

DIN 18313

German construction contract procedures (VOB) - Part C: General technical specifications in construction contracts (ATV) - Diaphragm walling

inactive
Buy Now
Organization: DIN
Publication Date: 1 August 2015
Status: inactive
Page Count: 16
ICS Code (Contractual aspects): 91.010.20
ICS Code (Earthworks. Excavations. Foundation construction. Underground works): 93.020
scope:

This standard deals with the construction of retaining walls, cut-off walls, barrettes and other structural members in trenches using support fluids. It includes the excavation of such trenches with the aid of support fluid, reinforcement, concreting and the insertion of elements into the trenches.

This standard also applies to the construction and removal of guide walls and the necessary earthwork.

This standard does not cover the construction of thin sheet pile walls in which soil is displaced by impact driving, pressing or vibration driving of piles (see DIN 18304) nor does it cover drilling with the aid of slurry (see DIN 18301).

DIN 18299, clauses 1 to 5 shall also apply. In cases where the specifications of DIN 18299 contradict the present standard, DIN 18313 shall take precedence.

Document History

September 1, 2019
German construction contract procedures (VOB) - Part C: General technical specifications in construction contracts (ATV) - Diaphragm walling
A description is not available for this item.
September 1, 2016
German construction contract procedures (VOB) - Part C: General technical specifications in construction contracts (ATV) - Diaphragm walling
This standard deals with the construction of retaining walls, cut-off walls, barrettes and other structural members in trenches using support fluids. It includes the excavation of such trenches with...
DIN 18313
August 1, 2015
German construction contract procedures (VOB) - Part C: General technical specifications in construction contracts (ATV) - Diaphragm walling
This standard deals with the construction of retaining walls, cut-off walls, barrettes and other structural members in trenches using support fluids. It includes the excavation of such trenches with...
September 1, 2012
German construction contract procedures (VOB) - Part C: General technical specifications in construction contracts (ATV) - Diaphragm walling
This standard deals with the construction of retaining walls, cut-off walls, barrettes and other structural members in trenches using support fluids. It includes the excavation of such trenches with...
April 1, 2010
German construction contract procedures (VOB) - Part C: General technical specifications in construction contracts (ATV) - Diaphragm walling
A description is not available for this item.
December 1, 2002
Construction contract procedures (VOB) - Part C: General technical specifications in construction conracts (ATV); Diaphragm walling
A description is not available for this item.
December 1, 2000
Construction contract procedures (VOB) - Part C: General technical specifications in construction contracts (ATV); Diaphragm walling
A description is not available for this item.
June 1, 1996
Construction contract procedures (VOB) - Part C: General technical specifications in construction contracts (ATV) - Diaphragm wall construction
A description is not available for this item.

References

Advertisement