loading
SMACNA FIRE SMOKE & RAD - Fire, Smoke and Radiation Damper Installation Guide for HVAC Systems
September 1, 2002 - SMACNA

This guide reviews the pertinent language contained in the model codes, the terminology used in the codes and other relevant documents, and the requirements of plans and specifications as: (1) developed by architects, engineers, and systems designers; (2) reviewed by code officials; and (3)...

API FIRE PROTECTION - Fire Protection in Bulk Plants and Service Stations
January 1, 1933 - API

FOREWORD: This pamphlet is prepared for the purpose of making available in convenient form basic principles and rules of good practice which prevent the creation of fire hazards in the marketing of petroleum products. The marketing of more than 50,000,000 gal. of gasoline daily to millions...

ICBO ACCESSIBILITY - ACCESSIBILITY REFERENCE GUIDE
ICBO
A description is not available for this item.
ICBO FIRE SAFETY - FIRE AND LIFE SAFETY WORKBOOK
ICBO
A description is not available for this item.
ASTM F3083/F3083M-23 - Standard Specification for Emergency Conditions, Occupant Safety and Accommodations
February 1, 2023 - ASTM International

This specification covers emergency conditions, occupant safety and accommodations for occupants and cargo. The applicant for a design approval must seek the individual guidance of their respective civil aviation authority (CAA) body concerning the use of this standard as part of a certification...

ASTM F2956-22 - Standard Test Methods for Anchor Systems Used for Detention Hollow Metal Systems
June 1, 2022 - ASTM International

1.1 These test methods cover anchor systems used for the installation of fixed detention hollow metal vision systems and door assemblies of various materials and types of construction. These anchor systems are used to install fixed hollow metal vision systems and door assemblies in...

DS/ISO 3008-2 - Fire-resistance tests – Part 2: Lift landing door assemblies
June 6, 2017 - DS

ISO 3008-2:2017 specifies the method of test for determining the fire-resistance of lift landing door assemblies which can be exposed to a fire from the landing side. The procedure is applicable to all types of lift landing door assemblies used as a means of...

ISO 3008-2 - Fire-resistance tests - Part 2: Lift landing door assemblies
May 1, 2017 - ISO

This document specifies the method of test for determining the fire-resistance of lift landing door assemblies which can be exposed to a fire from the landing side. The procedure is applicable to all types of lift landing door assemblies used as a means of access...

DIN EN 81-58 - Safety rules for the construction and installation of lifts - Examination and tests - Part 58: Landing doors fire resistance test
May 1, 2018 - DIN

This European Standard specifies the method of test for determining the fire resistance of lift landing doors which may be exposed to a fire from the landing side. The procedure applies to all types of lift landing doors used as a means of access to lifts in...

CSA A440.6 - High exposure fenestration installation
January 1, 2020 - CSA

This Standard sets forth characteristics of effective and durable installation methods, in both new and existing buildings, of fenestration products within the scope of AAMA/WDMA/CSA 101/I.S.2/A440 that are intended for installation in buildings of all occupancies to which NBC Parts 3, 4, 5, and 6...

ASTM F1450-12a(2019) - Standard Test Methods for Hollow Metal Swinging Door Assemblies for Detention and Correctional Facilities
April 1, 2019 - ASTM International

4.1 A major concern for prison administrative officials is security barriers used in detention/correctional facilities. These test methods are designed to aid in identifying levels of physical security for swinging detention hollow metal door assemblies. 4.2 The construction and size of test...

Installing fire doors and doorsets
June 1, 2017 - BRE

Introduction Fire safety for building occupants is maintained through the provision of adequate means of escape in the event of a fire and by ensuring the fabric of the building does not contribute significantly to fire growth in the early stages following ignition. The...

CEI EN 50518 - Monitoring and Alarm Receiving Centre
November 1, 2019 - CEI

This document specifies the minimum requirements for monitoring, receiving and processing of alarm messages generated by alarm systems taking place as a part of the total fire, safety and security solution. For the purpose of this document, the term "alarm" is used in the broad sense to...

DS/EN 50518 - Monitoring and Alarm Receiving Centre
August 19, 2019 - DS

This European Standard specifies the minimum requirements for monitoring, receiving and processing of alarm messages generated by alarm systems taking place as a part of the total fire, safety and security solution. For the purpose of this standard, the term "alarm" is used in the broad...

A-A-59818 - TRUCK, FIRE FIGHTING (AIRCRAFT RESCUE) (A/S32P-34 - RAPID INTERVENTION VEHICLE)
February 27, 2018 - NPFC

This CID covers a commercial light Aircraft Rescue and Fire Fighting (ARFF) vehicle designed for rapid intervention. It has a 4x4 chassis; a diesel engine; an automatic transmission; a three person cab with at least two passenger doors and two access doors. The vehicle...

ASTM F1592-12(2019) - Standard Test Methods for Detention Hollow Metal Vision Systems
April 1, 2019 - ASTM International

4.1 A major concern for corrections administration officials is the resistance of security barriers used in detention/correctional facilities to certain types of physical attack that it is reasonable to expect in the field. These test methods are designed to aid in identifying a level of physical...

Advertisement