Companies live or die on the basis of estimating their costs. Preparing estimates and bidding for new jobs is a complex and often costly process. There is no substitute for on the job training -- until now. Drawing on the authors' combined experience of more than 70 years,...
Deliver software projects on time and within budget. This fully updated and expanded volume provides cost-estimating methods for projects using modern technologies including Java, object-oriented methods, and reusable components. Written by a pioneer and leading authority in...
Construction Cost Estimating equips a new generation of students and early-career professionals with the skills they need to bid successfully on projects. From developing bid strategies to submitting a completed bid, this innovative textbook introduces the fundamentals of construction...
This document addresses all phases of construction cost estimating from the initial start of design through modification estimates during construction. \1\UFC 3-730-01/1/ PROGRAMMING COST ESTIMATES FOR MILITARY CONSTRUCTION provides guidance for cost...
This standard defines a method for the sizing of non-functional software requirements. It complements ISO/IEC 20926:2009, which defines a method for the sizing of functional user requirements (FUR).1 This standard also describes the complementarity of functional and non-functional sizes, so...
"The essential, authoritative guide to providing accurate, systematic, and reliable estimating for construction projects-newly revised Pricing and bidding for construction work is at the heart of every construction business, and in the minds of construction consultants' poor bids lead to...
USE/RELATIONSHIP: The Cost and Hour Report (FlexFile) is the Department of Defense (DoD) system for collecting actual costs and hours related business data as part of the Cost and Software Data Reporting (CSDR). The resulting data repository serves as the primary source for...
Foreword It has long been recognized that "architecture" has a strong influence over the life cycle of a system. In the past, hardware-related architectural aspects were dominant, whereas software-related architectural integrity, when it existed, often was to be sacrificed first in the...
This standard draws on IEEE Std 12207™-2008 to describe system and software reuse processes.1 It describes the relationship of reuse processes to system life cycle processes described in Clause 6 (System Life Cycle Processes) of IEEE Std 12207-2008 and software life...
The design of reliable industrial and commercial power systems is of considerable interest to many people. Prior to 1962, a qualitative viewpoint was taken when attempting to achieve this objective. The need for a quantitative approach was first recognized in the early 1960s when a small group of...
Written for students taking courses in building and surveying, 'Estimating for Builders and Surveyors' describes and explains the method used by the estimator to build up prices or rates for items described in the SMM7 format. Each chapter is a self-contained unit related to a particular...
This standard describes a parameterized and abstracted power model enabling system, software, and hardware intellectual property (IP)-centric power analysis and optimization. It defines concepts for the development of parameterized, accurate, efficient, and complete power models for systems...
Process Capability Analysis: Estimating Quality presents a systematic exploration of process capability analysis and how it may be used to estimate quality. The book is designed for practitioners who are tasked with insuring a high level of quality for the products and services...
This recommended practice describes how to estimate the costs of industrial and commercial power systems, both new and those undergoing expansion or modernization. This recommended practice is restricted to the development of the relative capital cost of industrial and commercial...
Use/relationship: The Software/ Firmware Change Request will be used to alert or inform the government about changes to software and firmware and also to provide detailed information to the government about the changes and the estimated cost of the...
ACI 318-11 requires that the design of prestressed concrete members allow for prestress loss; however, the required level of detail for calculating losses is unspecified. The friction loss provisions for post-tensioned construction that first appeared in ACI 318-63 were removed from ACI 318-11....
Purpose With increasing transportation needs, funding limitations at both the federal and state levels, and the high cost of transportation improvement projects, it is important to have a toolbox of techniques that support accurate estimation of project costs. There is no single "right way"...
This document specifies the purpose and content of all identified systems and software life‐cycle and service management information items (documentation). The information item contents are defined according to generic document types, as presented in Clause 7, and the specific purpose of the...
Narrow Your Results