This TI covers the installation of Data Loggers which are intended to be in place for 6 months or more. Purpose of TI The requirements for the Permanent installation of Data Loggers are currently the same as for any permanent signalling installation. This makes rapid...
The installation of permanent data loggers that are part of the national rollout of Intelligent Infrastructure (II). Purpose This Technical Instruction details the requirements for Design, Installation and Commissioning for the National Rollout of Intelligent Infrastructure Compliant...
The installation of permanent data loggers that are part of the rollout of Intelligent Infrastructure. It shall only be used where work is carried out in accordance with the process described in TI149. Purpose This Technical Instruction details the test plan for Installation and...
This SAE Recommended Practice provides common data output formats and definitions for a variety of data elements that may be useful for analyzing the performance of automated driving system (ADS) during an event that meets the trigger threshold criteria specified in this document. The...
This Procedure applies to the consideration, provision and management of Data Logging Systems for Railtrack Signalling Infrastructure. Data Logging Systems encompassed by this Procedure are those that are planned, permanent, non-safety critical installations used for monitoring...
Introduction This document is the IECC PC Logger (IPL) Incident Investigator Briefing Note. It is intended to IECC incident investigators an overview of the IPL. Other briefing notes have been prepared for technicians (SCS-IPL-UG-3), managers (SCS-IPL-UG-2) and installation engineers...
This module of NR/L3/MTC/II0219 applies to all staff involved with the design, configuration, installation, commissioning and calibration of II RCM data loggers and related software systems.
Introduction This document is the IECC PC Logger (IPL) Installation Engineer Briefing Note. It is intended to give installation engineers information on installing the IPL hardware and software. Other briefing notes have been prepared for technicians (SCS-IPL-UG-3), incident investigators...
Introduction This document is the IECC PC Logger (IPL) Management Briefing Note. It is intended to give IECC managers an overview of the IPL. Other briefing notes have been prepared for technicians (SCS-IPL-UG-3), incident investigators (SCS-IPL-UG-4) and Installation Engineers...
This part of IEC 62974 specifies product and performance requirements for devices that fall under the heading of "monitoring and measuring systems used for data collection, gathering and analysis", for industrial, commercial and similar use rated below or equal to 1 kV AC and 1,5 kV DC....
This part of IEC 62974 specifies product and performance requirements for devices that fall under the heading of "monitoring and measuring systems used for data collection, gathering and analysis", for industrial, commercial and similar use rated below or equal to 1 kV AC and 1,5 kV DC These...
This part of IEC 6xxxx specifies product and performance requirements for devices part of "monitoring and measuring systems used for data collection, gathering and analysis", for industrial, commercial and similar use rated below or equal to 1 kV a.c. and 1,5 kV d.c. These devices are...
IEC 62974-1:2017 specifies product and performance requirements for devices that fall under the heading of "monitoring and measuring systems used for data collection, gathering and analysis", for industrial, commercial and similar use rated below or equal to 1 kV AC and 1,5...
This document specifies the communication schema designed to provide mobile machinery status data from a telematics provider's server to customer applications via the Internet. The data is collected from a mobile machine using telematics data-logging equipment and stored on a...
Purpose and Background This document is the User Guide for the Technician's Terminal Logger Recorder (TTLR), the PC based replacement for the Penny and Giles (P&G) tape logger and the VT100 terminal. NOTE During the P&G replacement programme, TTLR was defined as Technician's Terminal...