UNLIMITED FREE ACCESS TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

LUL - S2532

Maintenance of signalling and train control systems

inactive, Most Current
Organization: LUL
Publication Date: 1 March 2012
Status: inactive
Page Count: 9
scope:

This standard is directed to the asset stewards in preparing a maintenance regime. Guidance and methodology to achieve the minimum requirements of this standard can be found within the manual of good practice M7051.

This standard supersedes E7051 A3, which is withdrawn.

Purpose

This standard defines the minimum requirement to establish maintenance procedures and processes for use on London Underground signalling and train control systems. Guidance in achieving the requirements of this standard can be found within M7051, Manual of good practice; Signalling and signalling control systems maintenance..

Document History

S2532
March 1, 2012
Maintenance of signalling and train control systems
This standard is directed to the asset stewards in preparing a maintenance regime. Guidance and methodology to achieve the minimum requirements of this standard can be found within the manual of good...

References

Advertisement