UNLIMITED FREE ACCESS TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

PIP STS02465

Augered Cast-in-Place Piles Installation Specification

active, Most Current
Buy Now
Organization: PIP
Publication Date: 1 April 2019
Status: active
Page Count: 26
scope:

This Practice describes requirements for furnishing and installing augered cast-in-place (ACIP) piles also called continuous flight auger (CFA) piles. Test piles, pile load tests and pile integrity testing are included and shall be executed in accordance with this specification when required.

Document History

April 1, 2019
Augered Cast-in-Place Piles Installation Specification
This Practice describes requirements for furnishing and installing augered cast-in-place (ACIP) piles also called continuous flight auger (CFA) piles. Test piles, pile load tests and pile integrity...
PIP STS02465
April 1, 2019
Augered Cast-in-Place Piles Installation Specification
This Practice describes requirements for furnishing and installing augered cast-in-place (ACIP) piles also called continuous flight auger (CFA) piles. Test piles, pile load tests and pile integrity...
February 1, 2012
Augered Cast-in-Place Piles Installation Specification
This Practice describes the requirements for furnishing and installing ACIP piles. Probe piles and pile load tests are included and shall be executed in accordance with this specification when...
March 1, 2005
Augered Cast-in-Place Pile Installation Specification
This Practice describes the requirements for furnishing and installing augered cast-in-place piles. Probe piles and pile load tests are included if within the contact scope of work. Comment: PIP...

References

Advertisement