UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L3/SIG/19808 ISSUE 5

Hy-Drive Supplementary Point Drive System

active, Most Current
Organization: NR
Publication Date: 3 June 2023
Status: active
Page Count: 38
scope:

This work instruction specifies:

1) how to install and set up the Hy-Drive Supplementary Point Drive System when used on Network Rail controlled infrastructure; 

NOTE: This system is used in conjunction with an In-bearer Clamp lock to create the Hy-Drive Points System. This applies to systems that are used to operate switch lengths C to H switch on NR60/NR60 Mark 2 S&C and switch lengths F to G on NR56V S&C.

2) key differences between the Hy-Drive Mk1 and Mk2 designs (for NR60); and 

3) differences introduced with the introduction of NR56V Hy-Drive.

This work instruction covers the Hy-Drive systems used in NR60 Mark 1, NR60 Mark 2 and NR56V S&C (shown in Table 1).

It applies to staff assessed as competent to install and maintain Hy-Drive Supplementary Point Drive systems.

Purpose

This work instruction supports the installation and maintenance of the Hy-Drive Supplementary Point Drive System. It is intended to control the risk of incorrect componentry and set-up being applied in Hy-Drive systems. It is a reference document to support staff working with the system. 

Document History

NR/L3/SIG/19808 ISSUE 5
June 3, 2023
Hy-Drive Supplementary Point Drive System
This work instruction specifies: 1) how to install and set up the Hy-Drive Supplementary Point Drive System when used on Network Rail controlled infrastructure;  NOTE: This system is used in...
March 7, 2020
Hy-Drive Supplementary Point Drive System
This work instruction specifies: 1) how to install and set up the Hy-Drive Supplementary Point Drive System when used on Network Rail controlled infrastructure; NOTE: This system is used in...
August 18, 2014
Hy-Drive Supplementary Point Drive System
This Network Rail standard specifies requirements and guidance on the Hy-drive Supplementary Point Drive System which is used in conjunction with an In-bearer Clamp lock to create the Hy-drive Points...
September 3, 2011
Alstom So Hydraulic Supplementary Point Drive System - Installation & Set-Up
The contents of this standard are of relevance to all who are engaged in, or manage, Signalling Installation and Maintenance works on Network Rail controlled Infrastructure that includes Alstom SO...
February 12, 2007
Alstom So Hydraulic Supplementary Point Drive System - Installation & Set-Up
The contents of this document are of relevance to all who are engaged in, or manage, Signalling Installation and Maintenance works on Network Rail controlled Infrastructure that includes Alstom SO...

References

Advertisement