LUL - S1971

Power Cable Route Design, Testing and Recovery Requirements

active, Most Current
Organization: LUL
Publication Date: 1 June 2023
Status: active
Page Count: 25
scope:

This standard applies to LU and LU Suppliers installing cabling assets for which the London Underground (LU) Power Engineer is accountable, i.e.:

a) 400V distribution power cabling

b) traction and non-traction d.c. cabling

c) 11kV and 22kV cabling and associated pilots

d) cabling within 11kV and 22kV substations.

Cables defined as Station Sub-distribution Assets Mechanical & Electrical (M&E) are excluded.

Purpose

The purpose of this standard is to define the minimum requirements for the design of cable routes and the installation and testing of power supply and control cables.

Document History

S1971
June 1, 2023
Power Cable Route Design, Testing and Recovery Requirements
This standard applies to LU and LU Suppliers installing cabling assets for which the London Underground (LU) Power Engineer is accountable, i.e.: a) 400V distribution power cabling b) traction and...
May 1, 2022
Power Cable Route Design, Testing and Recovery Requirements
This standard applies to LU and LU Suppliers installing cabling assets for which the London Underground (LU) Power Engineer is accountable, i.e.: a) 400V distribution power cabling b) traction and...

References