UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/WI/ELP/27127

Work Instruction for Network Rail/Euro Tunnel Electrical Interface at Folkestone Operating and Maintenance Procedures (aka NR/WI/ELP/27137)

active, Most Current
Buy Now
Organization: NR
Publication Date: 1 December 2005
Status: active
Page Count: 12
scope:

This instruction sets out the electrical operating and maintenance procedures for work on the overhead catenary system, permanent way and distribution equipment at the interface between Network Rail and Eurotunnel at Folkestone.

Document History

NR/WI/ELP/27127
December 1, 2005
Work Instruction for Network Rail/Euro Tunnel Electrical Interface at Folkestone Operating and Maintenance Procedures (aka NR/WI/ELP/27137)
This instruction sets out the electrical operating and maintenance procedures for work on the overhead catenary system, permanent way and distribution equipment at the interface between Network Rail...
December 4, 2004
BR/Euro Tunnel Electrical Interface at Folkestone Operating & Maintenance Procedures
Introduction The attached document sets out the electrical operating and maintenance procedures for work on the overhead catenary system (OCS), permanent way (Track) and distribution equipment, at...

References

Advertisement