NR/L2/TRK/053/MOD04 ISSUE 1

Inspection and Repair to Control the Risk of Derailment at Switches: Module 4: Repair of Switches

inactive
Organization: NR
Publication Date: 3 December 2016
Status: inactive
Page Count: 14
scope:

This module of NR/L2/TRK/053 covers;

a) Process for determining the repair or replacement of switch components where a detailed inspection has identified that immediate or remedial action is required.

b) Welding and grinding requirements in relation to remedial action

c) Checks carried out both during and on completion of the remedial works

d) Lubrication following repair.

Document History

December 3, 2022
Inspection and Repair to Control the Risk of Derailment at Switches: Module 4: Technical Information
This module of NR/L2/TRK/053 covers: a) identification of facing switch derailment hazards; b) arrangements for planning and undertaking detailed inspections of switches; c) reporting of inspections...
September 7, 2019
Inspection and Repair to Control the Risk of Derailment at Switches: Module 4: Technical Information
This module of NR/L2/TRK/053 covers: a) identification of facing switch derailment hazards; b) arrangements for planning and undertaking detailed inspections of switches; c) reporting of...
Inspection and Repair to Control the Risk of Derailment at Switches: Module 4: Repair of Switches
This module of NR/L2/TRK/053 covers; a) Process for determining the repair or replacement of switch components where a detailed inspection has identified that immediate or remedial action is...
NR/L2/TRK/053/MOD04 ISSUE 1
December 3, 2016
Inspection and Repair to Control the Risk of Derailment at Switches: Module 4: Repair of Switches
This module of NR/L2/TRK/053 covers; a) Process for determining the repair or replacement of switch components where a detailed inspection has identified that immediate or remedial action is...