UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L2/TRK/053/MOD04 ISSUE 4

Inspection and Repair to Control the Risk of Derailment at Switches: Module 4: Technical Information

active, Most Current
Organization: NR
Publication Date: 3 December 2022
Status: active
Page Count: 37
scope:

This module of NR/L2/TRK/053 covers:
a) identification of facing switch derailment hazards;
b) arrangements for planning and undertaking detailed inspections of switches;
c) reporting of inspections completed and defects found; and
d) permitted substitution and delegation of inspections.
This module does not cover:
e) frequencies for Basic Visual Inspections, Section Manager [Track] Inspections and Track Maintenance Engineer inspections (see NR/L2/TRK/001/mod02);
f) how to complete a detailed inspection (see NR/L2/TRK/053/mod02); and
g) repair of defects (see NR/L2/TRK/053/mod03).

Document History

NR/L2/TRK/053/MOD04 ISSUE 4
December 3, 2022
Inspection and Repair to Control the Risk of Derailment at Switches: Module 4: Technical Information
This module of NR/L2/TRK/053 covers: a) identification of facing switch derailment hazards; b) arrangements for planning and undertaking detailed inspections of switches; c) reporting of inspections...
September 7, 2019
Inspection and Repair to Control the Risk of Derailment at Switches: Module 4: Technical Information
This module of NR/L2/TRK/053 covers: a) identification of facing switch derailment hazards; b) arrangements for planning and undertaking detailed inspections of switches; c) reporting of...
Inspection and Repair to Control the Risk of Derailment at Switches: Module 4: Repair of Switches
This module of NR/L2/TRK/053 covers; a) Process for determining the repair or replacement of switch components where a detailed inspection has identified that immediate or remedial action is...
December 3, 2016
Inspection and Repair to Control the Risk of Derailment at Switches: Module 4: Repair of Switches
This module of NR/L2/TRK/053 covers; a) Process for determining the repair or replacement of switch components where a detailed inspection has identified that immediate or remedial action is...

References

Advertisement