UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

LUL - T0528

Signalling equipment overhaul specification Tripcock tester (motorised and un-motorised)

inactive
Organization: LUL
Publication Date: 1 April 2017
Status: inactive
Page Count: 30
scope:

This specification is written to comply with engineering standard S1202 'Signal Equipment Overhaul' in defining the requirements for the overhaul of the two types of Tripcock Testers which are used extensively in the signalling system on LU.

The specification hierarchy which supports these requirements is detailed in Attachment 3 to this specification.

Purpose

This specification has been written to detail the overhaul requirements for the two types of Tripcock Testers which are used in the signalling system on the London Underground (LU).

Document History

June 1, 2022
Signalling equipment overhaul specification Tripcock tester (motorised and un-motorised)
This specification should be used by all those when engaged in the overhaul of the two types of Tripcock Testers which are used extensively in the signalling system on LU. This specification is...
T0528
April 1, 2017
Signalling equipment overhaul specification Tripcock tester (motorised and un-motorised)
This specification is written to comply with engineering standard S1202 ‘Signal Equipment Overhaul’ in defining the requirements for the overhaul of the two types of Tripcock Testers which are used...
March 1, 2015
Signalling equipment overhaul specification Tripcock tester (motorised and un-motorised)
This Specification is written to comply with Engineering Standard 1-202 in defining the requirements for the overhaul of the two types of Tripcock Testers which are used extensively in the signalling...
November 1, 2011
Signalling equipment overhaul specification Tripcock tester (motorised and un-motorised)
This Specification is written to comply with Engineering Standard 1-202 in defining the requirements for the overhaul of the two types of Tripcock Testers which are used extensively in the signalling...

References

Advertisement