LUL - T0524
Signalling equipment overhaul specification H5 trainstop
| Organization: | LUL |
| Publication Date: | 1 May 2017 |
| Status: | inactive |
| Page Count: | 44 |
scope:
This specification is written to comply with engineering standard S1202 'Signal Equipment Overhaul' in defining the requirements for the overhaul of all variants of the H5 Trainstop which are used in the signalling system on the LU.
Purpose
The purpose of this specification is detail the overhaul requirements of the H5 Trainstop which is used in the signalling system on the London Underground (LU).
Document History