NR/L3/OPS/045/2.15
National Operating Procedure (NOP) 2.15: Mandatory and Additional Visits to Employees at Operating Locations
| Organization: | NR |
| Publication Date: | 2 June 2018 |
| Status: | active |
| Page Count: | 7 |
scope:
This procedure applies to:
a) Crossing Keepers;
b) Moveable Bridge Operators;
c) Shift Signaller Managers;
d) Mobile Operations Managers;
e) Route Operations Controllers; and
f) Electrical Control Room Operators.
Visits to signallers are covered in NR/L3/OPS/045/2.06.
PURPOSE
This procedure provides assurance that:
a) operational activities are being carried out correctly; and
b) equipment is being:
i) operated safely;
ii) operated in accordance with rules and Instructions; and
iii) maintained in good working order.
This includes visits to signalling locations.
Document History