UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

ETSI - EN 305 200-1

Access, Terminals, Transmission and Multiplexing (ATTM); Energy management; Operational infrastructures; Global KPIs; Part 1: General requirements

active, Most Current
Organization: ETSI
Publication Date: 1 July 2018
Status: active
Page Count: 19
scope:

The present document describes the energy management landscape of the operational infrastructures of broadband deployment addressed by this multi-part deliverable, their inter-relationship and boundaries.

It specifies the following aspects for Global Key Performance Indicators in relation to energy management for the operational infrastructures of broadband deployment:

• common objectives in relation to energy consumption:

- energy consumption;

- task effectiveness;

- energy re-use;

- renewable energy;

• general requirements for all KPIs specified in the other standards in the ETSI EN 305 200 series [i.2] in relation to:

- infrastructure scalability;

- infrastructure evolution;

- formulae and definition of terms;

- measurement points and procedures;

• the use of KPIs.

The environmental impact and management of different energy sources are outside the scope of the present document.

Within the present document:

• clause 4 explains the context underlying the need for the development of Global KPIs for energy efficiency and introduces the Objective KPIs upon which the Global KPIs are founded;

• clause 5 specifies the general requirements that are applied to all KPIs defined within the standards in the ETSI EN 305 200-2 series and ETSI EN 305 200-3 series;

• clause 6 summarizes the applicability of the Global and Objective KPIs defined within the standards in the ETSI EN 305 200-2 series and ETSI EN 305 200-3 series.

Document History

EN 305 200-1
July 1, 2018
Access, Terminals, Transmission and Multiplexing (ATTM); Energy management; Operational infrastructures; Global KPIs; Part 1: General requirements
The present document describes the energy management landscape of the operational infrastructures of broadband deployment addressed by this multi-part deliverable, their inter-relationship and...
April 1, 2018
Access, Terminals, Transmission and Multiplexing (ATTM); Energy management; Operational infrastructures; Global KPIs; Part 1: General requirements
The present document describes the energy management landscape of the operational infrastructures of broadband deployment addressed by this multi-part deliverable, their inter-relationship and...

References

Advertisement