UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

ETSI - EN 305 200-2-3

Access, Terminals, Transmission and Multiplexing (ATTM); Energy management; Operational infrastructures; Global KPIs; Part 2: Specific requirements; Sub-part 3: Mobile broadband access networks

pending, Most Current
Organization: ETSI
Publication Date: 1 June 2018
Status: pending
Page Count: 24
scope:

The present document specifies the requirements for a Global KPI for energy management (KPIEM) and their underpinning Objective KPIs addressing the following objectives for the mobile access networks of broadband deployment:

• energy consumption;

• task effectiveness;

• renewable energy.

The requirements are mapped to the general requirements of ETSI EN 305 200-1 [i.2].

Energy management of mobile access networks comprises a number of independent layers. The present document addresses performance of infrastructures that supports the normal function of hosted ICT equipment within the mobile access network (e.g. power distribution, environmental control, security and safety).The present document does not address other layers such as performance of ICT equipment itself, performance of usage of available processing power, and layers related to final service delivered (e.g. processing power required per itemized outcome) or overlay layers (e.g. energy consumption required per itemized outcome).

The environmental impact and management of different energy sources are outside the scope of the present document.

Within the present document:

• clause 4 describes the energy parameters for mobile access networks together with inclusions/exclusions of different energy contributions;

• clause 5 specifies the requirements for measurement, calculation, classification and reporting of KPIEM.

Document History

EN 305 200-2-3
June 1, 2018
Access, Terminals, Transmission and Multiplexing (ATTM); Energy management; Operational infrastructures; Global KPIs; Part 2: Specific requirements; Sub-part 3: Mobile broadband access networks
The present document specifies the requirements for a Global KPI for energy management (KPIEM) and their underpinning Objective KPIs addressing the following objectives for the mobile access networks...
February 1, 2018
Access, Terminals, Transmission and Multiplexing (ATTM); Energy management; Operational infrastructures; Global KPIs; Part 2: Specific requirements; Sub-part 3: Mobile broadband access networks
The present document specifies the requirements for a Global KPI for energy management (KPIEM) and their underpinning Objective KPIs addressing the following objectives for the mobile access networks...

References

Advertisement