UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

ETSI - TS 105 200-2-2

Access, Terminals, Transmission and Multiplexing (ATTM); Energy management; Operational infrastructures; Implementation of Global KPIs; Part 2: Specific requirements; Sub-part 2: Fixed broadband access networks

active, Most Current
Organization: ETSI
Publication Date: 1 December 2019
Status: active
Page Count: 32
scope:

The reporting of Global KPIs in accordance with ETSI EN 305 200-2-2 [2] requires the collection of data to enable the calculation of the following aspects:

• Objective KPI relating to task efficiency (KPITE) based on data_volume and total energy consumption (KPIEC).

• Objective KPI relating to the use of renewable energy (KPIREN).

The present document supports the requirements of ETSI EN 305 200-2-2 [2] providing a framework for, and detailing, the implementation procedures including any necessary techniques for estimation of energy consumption together with clarification and treatment of different types of data volume.

Document History

TS 105 200-2-2
December 1, 2019
Access, Terminals, Transmission and Multiplexing (ATTM); Energy management; Operational infrastructures; Implementation of Global KPIs; Part 2: Specific requirements; Sub-part 2: Fixed broadband access networks
The reporting of Global KPIs in accordance with ETSI EN 305 200-2-2 [2] requires the collection of data to enable the calculation of the following aspects: • Objective KPI relating to task...

References

Advertisement