BSI - BS 5975
Code of practice for temporary works procedures and the permissible stress design of falsework
| Organization: | BSI |
| Publication Date: | 31 December 2008 |
| Status: | inactive |
| Page Count: | 216 |
| ICS Code (Construction equipment): | 91.220 |
scope:
Gives recommendations for the methods of design, erection and use of temporary structures used to support permanent structures until such time as the latter becomes self-supporting. Provides recommendations on the design of falsework using permissible stress methods and on procedures for the successful management of work on site, including the appointment of a falsework coordinator. BS EN 12812:2004 now exists in parallel with this standard and specifies performance requirements for the design of falsework in accordance with one of three classes: A, B1 and B2. Limit state design methods are specified for design classes B1 and B2. It does not provide guidance for the structural design of Class A. BS EN 12812:2004 does not provide guidance on procedures necessary for the successful management of work on site.
Document History