BSI - BS 5975
Code of practice for temporary works procedures and the permissible stress design of falsework
inactive
Buy Now
| Organization: | BSI |
| Publication Date: | 31 December 2008 |
| Status: | inactive |
| Page Count: | 228 |
| ICS Code (Construction equipment): | 91.220 |
Document History
May 31, 2019
Code of practice for temporary works procedures and the permissible stress design of falsework
A description is not available for this item.
BS 5975
December 31, 2008
Code of practice for temporary works procedures and the permissible stress design of falsework
A description is not available for this item.
December 31, 2008
Code of practice for temporary works procedures and the permissible stress design of falsework
Gives recommendations for the methods of design, erection and use of temporary structures used to support permanent structures until such time as the latter becomes self-supporting. Provides...
December 31, 2008
Code of practice for temporary works procedures and the permissible stress design of falsework
This British Standard gives recommendations and guidance on the procedural controls to be applied to all aspects of temporary works in the construction industry. It also includes guidance on design,...
March 31, 1982
Code of Practice for Falsework
Gives recommendations for the methods of design, erection and use of temporary structures used to support permanent structures until such time as the latter become self-supporting.