UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NAVY - OPNAV 3501.115F

(N95) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR THE NAVAL CONSTRUCTION FORCE

inactive
Organization: NAVY
Publication Date: 25 October 2018
Status: inactive
Page Count: 109
scope:

Purpose

To issue the required operational capabilities (ROC) and the projected operational environment (POE) for elements of the naval construction force (NCF).

This instruction has been revised to update required readiness levels across several mission areas, account for additional of ROCs, and to better align with reference (a) provisions.

Document History

February 6, 2023
(N95) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR THE NAVAL CONSTRUCTION FORCE
Scope and Applicability. a. Per reference (a), enclosures (1) through (20) will be used to assist with determining specific mission area and the necessary details to describe the mission areas,...
OPNAV 3501.115F
October 25, 2018
(N95) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR THE NAVAL CONSTRUCTION FORCE
Purpose To issue the required operational capabilities (ROC) and the projected operational environment (POE) for elements of the naval construction force (NCF). This instruction has been revised to...
April 14, 2014
(N95) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR THE NAVAL CONSTRUCTION FORCE
Purpose. To issue the required operational capabilities (ROC) and the projected operational environment (POE) for elements of the naval construction force (NCF). This instruction is being reissued...
May 13, 2002
R PROJECTED OPERATIONAL ENVIRONMENT (POE) AND REQUIRED OPERATIONAL CAPABILITIES (ROC) FOR THE NAVAL CONSTRUCTION FORCE (NCF)
A description is not available for this item.
November 26, 1997
R PROJECTED OPERATIONAL ENVIRONMENT (POE) AND REQUIRED OPERATIONAL CAPABILITIES (ROC) FOR THE NAVAL CONSTRUCTION FORCE (NCF)
A description is not available for this item.
Advertisement