NAVY - OPNAV 3501.115C
R PROJECTED OPERATIONAL ENVIRONMENT (POE) AND REQUIRED OPERATIONAL CAPABILITIES (ROC) FOR THE NAVAL CONSTRUCTION FORCE (NCF)
inactive
| Organization: | NAVY |
| Publication Date: | 26 November 1997 |
| Status: | inactive |
Document History
February 6, 2023
(N95) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR THE NAVAL CONSTRUCTION FORCE
Scope and Applicability.
a. Per reference (a), enclosures (1) through (20) will be used to assist with determining specific mission area and the necessary details to describe the mission areas,...
October 25, 2018
(N95) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR THE NAVAL CONSTRUCTION FORCE
Purpose
To issue the required operational capabilities (ROC) and the projected operational environment (POE) for elements of the naval construction force (NCF).
This instruction has been revised to...
April 14, 2014
(N95) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR THE NAVAL CONSTRUCTION FORCE
Purpose. To issue the required operational capabilities (ROC) and the projected operational environment (POE) for elements of the naval construction force (NCF). This instruction is being reissued...
May 13, 2002
R PROJECTED OPERATIONAL ENVIRONMENT (POE) AND REQUIRED OPERATIONAL CAPABILITIES (ROC) FOR THE NAVAL CONSTRUCTION FORCE (NCF)
A description is not available for this item.
OPNAV 3501.115C
November 26, 1997
R PROJECTED OPERATIONAL ENVIRONMENT (POE) AND REQUIRED OPERATIONAL CAPABILITIES (ROC) FOR THE NAVAL CONSTRUCTION FORCE (NCF)
A description is not available for this item.