UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NAVY - OPNAV 3501.115G

(N95) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR THE NAVAL CONSTRUCTION FORCE

active, Most Current
Organization: NAVY
Publication Date: 6 February 2023
Status: active
Page Count: 240
scope:

Scope and Applicability.

a. Per reference (a), enclosures (1) through (20) will be used to assist with determining specific mission area and the necessary details to describe the mission areas, environment and operational capabilities for which the NCF is structured.

b. Enclosures (1) through (20) will also be used to assist with determining specific mission area C-ratings reported under reference (b).

c. This instruction provides resource agencies information describing NCF mission requirements, capabilities and the types and locations of operational employment. Together, the ROC and POE establish tasking which produces a measurable workload to compute personnel requirements for activity manpower documents.

Purpose.

To establish required operational capabilities (ROC) and the projected operational environment (POE) for the Naval Construction Force (NCF). This instruction is a complete rewrite to align ROCs established in reference (a) with new NCF force structure and updated readiness levels and must be reviewed in its entirety.

Document History

OPNAV 3501.115G
February 6, 2023
(N95) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR THE NAVAL CONSTRUCTION FORCE
Scope and Applicability. a. Per reference (a), enclosures (1) through (20) will be used to assist with determining specific mission area and the necessary details to describe the mission areas,...
October 25, 2018
(N95) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR THE NAVAL CONSTRUCTION FORCE
Purpose To issue the required operational capabilities (ROC) and the projected operational environment (POE) for elements of the naval construction force (NCF). This instruction has been revised to...
April 14, 2014
(N95) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR THE NAVAL CONSTRUCTION FORCE
Purpose. To issue the required operational capabilities (ROC) and the projected operational environment (POE) for elements of the naval construction force (NCF). This instruction is being reissued...
May 13, 2002
R PROJECTED OPERATIONAL ENVIRONMENT (POE) AND REQUIRED OPERATIONAL CAPABILITIES (ROC) FOR THE NAVAL CONSTRUCTION FORCE (NCF)
A description is not available for this item.
November 26, 1997
R PROJECTED OPERATIONAL ENVIRONMENT (POE) AND REQUIRED OPERATIONAL CAPABILITIES (ROC) FOR THE NAVAL CONSTRUCTION FORCE (NCF)
A description is not available for this item.

References

Advertisement