UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L3/TRK/1101

The Management of Rail Defect Removal Timescales

active, Most Current
Buy Now
Organization: NR
Publication Date: 4 September 2010
Status: active
Page Count: 19
scope:

This Procedure defines the process, roles and responsibilities in the management of occasional short term dispensations for the exceedence of maximum allowable timescales for the removal of discrete rail defects, as described above.

The process and the template Temporary Dispensation Application Form, Appendix A, supported by the templated risk assessment forms, Appendices B & C must be used. On these sites, the SM[T] must propose risk controls, appropriate to the site, for review by the Track Maintenance Engineer.

This Procedure must not be used to provide dispensation to the requirements defined in Network Rail Standards for the imposition of ESRs or TSRs.

For sites with Rolling Contact Fatigue, the minimum actions and timescales prescribed in NR/L2/TRK/001/B01 shall be achieved, these sites are not covered by this Procedure,

Purpose

The minimum actions for the removal of rail defects, including timescales and, where appropriate, risk controls, are defined in Network Rail Standards :-

  • NR/L2/TRK/001/B01, Inspection and Maintenance of Permanent Way - Rail Management.
  • NR/L2/TRK/0032, Joining Of Rails By Aluminothermic Welding
  • NR/L2/TRK/053, Inspection and Repair Procedures to Reduce the Risk of Derailment at Switches.
  • NR/L2/TRK/054, Inspection of Cast Crossings and Cast Vees in The Track
  • NR/L2/TRK/0132, Weld Repair of Rails

This procedure does not cover the Temporary non-compliance process as covered by NR/L2/EBM/STP/001 Network Rail Standards Management - Process Requirements.

Where there is a justifiable reason for inability to comply with the specified maximum timescales for the removal of discrete defects, a TME (or nominated deputy authorised by the RAM (Track) in their absence) is authorised to approve a temporary dispensation to extend the removal timescales. This approval must be supported by a risk assessment supplied by the Section Manager [Track] (SM[T]), which includes the imposition of any additional risk controls, as appropriate.

Document History

NR/L3/TRK/1101
September 4, 2010
The Management of Rail Defect Removal Timescales
This Procedure defines the process, roles and responsibilities in the management of occasional short term dispensations for the exceedence of maximum allowable timescales for the removal of discrete...
August 26, 2008
The management of rail defect removal timescales
This Procedure defines the process, roles and responsibilities in the management of occasional short term dispensations for the exceedence of maximum allowable timescales for the removal of discrete...
Management of Rail Defect Removal Timescales
This Procedure defines the process, roles and responsibilities in the management of occasional short term dispensations for the exceedence of maximum allowable timescales for the removal of discrete...

References

Advertisement