NAVY - OPNAV 4700.8L CH-1
(N9) TRIALS, ACCEPTANCE, COMMISSIONING, FITTING OUT, SHAKEDOWN, AND POST-SHAKEDOWN AVAILABILITY OF U.S. NAVAL SHIPS UNDERGOING CONSTRUCTION OR CONVERSION
| Organization: | NAVY |
| Publication Date: | 3 September 2021 |
| Status: | active |
| Page Count: | 25 |
scope:
Purpose.
To transmit new pages 5, 14, 17 and page 2 of enclosure 1 of the basic instruction to clarify the President, Board of Inspection and Survey responsibilities at preliminary acceptance concerning fleet introduction, to change when final contract trials are generally conducted for new construction ships and to clarify the status of non-nuclear ships from preliminary acceptance through commissioning. These changes are necessary to correct errors that were included in the final signed document.