NR/L2/TRK/3419 ISSUE 1

Lifting, Storing and Transporting Track Materials

active, Most Current
Organization: NR
Publication Date: 4 December 2021
Status: active
Page Count: 24
scope:

This document applies within Network Rail Managed Infrastructure to the lifting, storage and transportation of; 

1) rails;

2) insulated rail joints;

3) sleepers and bearers;

4) half sets of switches;

5) crossings; and

6) S&C and plain line panels.

This standard does not apply to rail transportation of materials.

This standard does not supersede the requirement of any regulations surrounding lifting materials or lift planning.

Purpose

This document provides a process to control the risk of damage to track materials during lifting, storage and transportation.

Document History

NR/L2/TRK/3419 ISSUE 1
December 4, 2021
Lifting, Storing and Transporting Track Materials
This document applies within Network Rail Managed Infrastructure to the lifting, storage and transportation of;  1) rails; 2) insulated rail joints; 3) sleepers and bearers; 4) half sets of...