This document references:
T0433 - Conductor Rail Arc Welding
Published by LUL
on
April 1, 2022
This specification applies to steel conductor rails and steel conductor rail ramps using the arc-welding process on site. It does not apply to composite conductor rail. This specification applies to...
This document references:
T0433 - Conductor Rail Arc Welding
Published by LUL
on
April 1, 2022
This specification applies to steel conductor rails and steel conductor rail ramps using the arc-welding process on site. It does not apply to composite conductor rail. This specification applies to...
This document is referenced by:
S1178 - Rail Defect Management
Published by LUL
on
January 1, 2023
This standard applies to all rail in running lines and depot entry lines only on LU and it is applicable to all track staff in the AP and Capital directorates that have responsibilities for...
This document is referenced by:
S1157 - Track – Performance, Design and Configuration
Published by LUL
on
March 1, 2023
This standard applies to all London Underground (LU) track including running lines depot track and sidings. The standard covers: a) principles for new designs of track components and configurations...
This document is referenced by:
S1179 - Track – Completed works; Dimensions and Tolerances
Published by LUL
on
March 1, 2023
This standard applies to all London Underground (LU) track, including plain line and junction work in open, sub-surface and tube sections and in sidings and depots. This standard does not apply to...
This document is referenced by:
G3208 - Emergency track repairs
Published by LUL
on
December 1, 2023
This handbook covers situations where the track is the sole asset category involved, such as broken rails or blockjoint failures, and those which affect more than one category of asset, for example...