This document references:
S1538 - Assurance
Published by LUL
on
August 1, 2022
This standard applies to all parties introducing changes or delivering contracts for service on or about LU’s infrastructure, or premises, or affecting LU. This shall include any enabling works,...
This document references:
S1371 - Station Planning
Published by LUL
on
November 1, 2022
This standard applies to proposers of design of or change to the public spatial provision for: a) new stations b) existing stations – new or altered assets c) temporary works This standard sets out...
This document references:
S1166 - Cleaning of the track environment
Published by LUL
on
April 1, 2020
This standard applies to the Permanent Way system in running lines, depots and sidings, including track sections, tunnels, station grounds, walkways and all components. Purpose The purpose of this...
This document references:
S1162 - Conductor rail – Performance, design and configuration
Published by LUL
on
September 1, 2021
This standard applies to the conductor rail system. It covers: a) the fundamental design criteria to be met in any new proposal involving the conductor rail system b) requirements to avoid the...
This document references:
S1158 - Track – Inspection and Maintenance
Published by LUL
on
August 1, 2023
This standard applies to the Permanent Way system in running lines, depots and sidings. It covers, but is not limited to, the following components of track: a) running rails b) check rails c) rail...
This document is referenced by:
T0006 - Deep Tube Tunnels Materials and Workmanship
Published by LUL
on
December 1, 2022
This specification applies to all works on LU that contains elements that will form part of, interface with or otherwise impact, the deep tube tunnel and shaft assets. The definition of which assets...
This document is referenced by:
G0058 - Civil Engineering - Technical Advice Notes
Published by LUL
on
July 1, 2022
The scope of CETANs covers all aspects of Civil Engineering. London Underground manages infrastructure which has been constructed over many years, incorporating assets, materials and methodologies,...
This document is referenced by:
G1413 - Planning new lines and extensions to existing lines
Published by LUL
on
August 1, 2021
This guidance should be used by developers, local authorities, consultants, other third party promoters and Transport for London (TfL) and London Underground (LU) staff. It covers the planning...
This document is referenced by:
S1063 - Civil Engineering - Cutting, Grinding, Drilling, Fixing to, and Supporting from, Existing Structures
Published by LUL
on
June 1, 2022
This standard applies wherever there is a proposal to cut or grind away, drill into, fix to, or support from, any part of the fabric of existing LU Infrastructure (including Premises, Structures,...