UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L2/OHS/019 ISSUE 12

Safety of People at Work on or Near the Line

active, Most Current
Organization: NR
Publication Date: 3 June 2023
Status: active
Page Count: 37
scope:

This standard applies: 

a) to anyone walking and/or working 'on or near the line'; 

b) where work on the lineside has the potential to affect the safe running of the operational railway; 

c) to those working on behalf of Network Rail, third parties, their contractors, and sub-contractors; 

d) to those involved in the development of a SSoW through the production and issuing of a SWP. 

A SWP is not needed for: 

a) a Signaller who can work under their own protection; 

b) Designated Persons; 

c) emergency services including coast guard and bomb disposal; 

d) pilot duties associated with modules P1 and P2 of GERT/8000; 

e) authorised railway staff retrieving objects from the line within platform limits to GERT/8000 Module TS1.13.1; 

f) work that is segregated from the railway, such as: 

1) Platform works (unless within 1.25m of the platform edge); 

2) work within the area termed 'lineside' and not affecting the operational railway. 

g) work planned in accordance with NR/L2/OHS/00130 Creating a Site of Work Segregated from the Railway.  

Purpose

The purpose of the standard is to: 

a) control access, egress, walking and working on or near the line including site risks and task risks and/or anything that could affect operational safety of the line; 

b) control train, on-track machine (OTM) and on-track plant (OTP) movementrisks to people walking and/or working on or near the line. 

This standard describes how the planning of work is carried out by the responsible manager (RM), Planner, person in charge and any other individuals involved in planning the work by: 

a) outlining the role of Planner, RM and person in charge; 

b) confirming the verification (person in charge) and authorisation (RM) of the Safe Work Pack (SWP) is not done by the same person; 

c) confirming suitable risk assessment(s) is considered in the planning; 

d) confirming the person in charge can maintain a Safe System of Work (SSoW)whilst walking or working on or near the line; 

e) identifying the key roles involved in planning and delivering of the SSoW; 

f) complying with the Rule Book GE/RT8000

Document History

NR/L2/OHS/019 ISSUE 12
June 3, 2023
Safety of People at Work on or Near the Line
This standard applies:  a) to anyone walking and/or working 'on or near the line’;  b) where work on the lineside has the potential to affect the safe running of the operational railway;  c) to...
September 3, 2022
Safety of People at Work on or Near the Line
This standard applies to all persons involved in the planning and delivery of work on or near the line or which could affect the area termed “on or near the line”, carried out by or on behalf of...
December 5, 2020
Safety of People at Work On or Near the Line
This standard applies to all persons involved in the planning and delivery of work on or near the line or which could affect the area termed “on or near the line” , carried out by or on behalf of...
March 4, 2017
Safety of People at Work on or Near the Line
This standard applies to all persons involved in the planning and delivery of work on or near the line or which could affect the area termed “on or near the line”, carried out by or on behalf of...
September 4, 2010
Safety of People Working on or near the Line
This specification applies to all work (including walking as a group) On or Near the Line carried out by or on behalf of Network Rail and outside parties, and their contractors and sub-contractors....
August 26, 2008
Safety of People Working on or near the Line
This specification applies in respect of all work (including walking as a group) on or near the line for Network Rail, outside parties and their contractors and subcontractors. The specification...
August 1, 2006
Safety of People working on or near the Line
This specification applies in respect of all work (including walking as a group) on or near the line for Network Rail, outside parties and their contractors and subcontractors. The specification...
August 1, 2005
Safety of People Working on or near the Line
This specification applies in respect of all work (including walking as a group) on or near the line for Network Rail, outside parties and their contractors and sub-contractors. It is intended to...
February 1, 2005
Safety of People Working on or near the Line
This specification applies in respect of all work (including walking as a group) on or near the line for Network Rail, outside parties and their contractors and sub-contractors. It is intended to...
April 3, 2004
Safety of People Working on or near the Line
This specification applies in respect of all work (including walking as a group) on or near the line for Network Rail, outside parties and their contractors and sub-contractors. It is intended to...
December 7, 2002
Protection of People Working on or near the Line
This specification applies in respect of all work (including walking as a group) on or near the line for Railtrack, outside parties and their contractors and sub-contractors. It is intended to...
April 6, 2002
Protection of People Working on or near the Line
This specification applies to the protection of people working on or near the line for Railtrack, outside parties and their contractors and sub-contractors. It is intended to support the requirements...

References

Advertisement