UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L2/RSE/100/04 ISSUE 1

Acceptance Panel Processes: New or Changed Vehicles on Infrastructure

inactive
Organization: NR
Publication Date: 3 December 2011
Status: inactive
Page Count: 5
scope:

This Network Rail module specifies how an applicant:

a) introduces new or changed vehicles onto the network;

b) changes the routes where existing vehicles operate.

It applies to applications from within Network Rail and external parties.

It does not include vehicles operating only in possessions.

Purpose

New or changed vehicles, or changes to routes where existing vehicles operate, have to be assessed for:

a) compatibility between the infrastructure and the vehicle;

b) technical requirements (Network Rail projects only).

This module sets out the processes to be followed by an applicant to achieve these requirements. The module supports GE/RT8270 Assessment of Compatibility of Rolling Stock and Infrastructure.

This module is part of a suite of processes governed by Network Rail Acceptance Panel (NRAP) to reduce the risk of projects, products or vehicles being brought into service without appropriate review.

The other modules in the suite are:

NR/L2/RSE/100/01 Network Rail Acceptance Panel

NR/L2/RSE/100/02 Safety verification

NR/L2/RSE/100/03 Compliance with interoperability regulations for infrastructure projects

NR/L2/RSE/100/05 Product introduction and change

NR/L2/RSE/100/06 How to decide what needs product acceptance via NR/L2/RSE/100/05

NR/L2/RSE/100/07 System Review Panels

NOTE Information on roles and responsibilities, and definitions used in this module can be found in NR/L2/RSE/100/01.

Document History

December 5, 2015
Network Rail Assurance Panel Processes: Introduction of New or Modified Vehicles
This module specifies the process to introduce a new or modified rail vehicle onto Network Rail infrastructure. It applies when Network Rail is the affected party or proposer. It does not apply to...
NR/L2/RSE/100/04 ISSUE 1
December 3, 2011
Acceptance Panel Processes: New or Changed Vehicles on Infrastructure
This Network Rail module specifies how an applicant: a) introduces new or changed vehicles onto the network; b) changes the routes where existing vehicles operate. It applies to applications from...

References

Advertisement