UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

DIN 18301

German construction contract procedures (VOB) - Part C: General technical specifications in construction contracts (ATV) - Drilling works

inactive
Buy Now
Organization: DIN
Publication Date: 1 September 2012
Status: inactive
Page Count: 14
ICS Code (Contractual aspects): 91.010.20
ICS Code (Earthworks. Excavations. Foundation construction. Underground works): 93.020
scope:

This standard deals with the drilling of holes, irrespective of their heading (orientation), in soil or rock, for the purposes of

- site and groundwater investigations, water extraction and discharge, ground water lowering, drainage, degasification, geothermal exploration;

- grouting (including jet grouting), constructing bored or grouted piles, constructing contiguous bored pile walls, including those for supporting and sealing;

- installing anchorages and other structural elements, probes and measuring equipment.

This standard also covers

- drilling in contaminated areas (cf. subclause 1.1);

- drilling work for the purposes of maintaining, repairing or decommissioning wells or ground water gauging stations;

- backfilling of boreholes to be abandoned.

This standard does not cover:

- borehole sinking operations (cf. DIN 18302);

- trenchless pipelaying (cf. DIN 18319).

DIN 18299 clauses 1 to 5 shall also apply. In cases where the specifications of DIN 18299 contradict the present standard, the latter shall take precedence.

Document History

September 1, 2019
German construction contract procedures (VOB) - Part C: General technical specifications in construction contracts (ATV) - Drilling works
A description is not available for this item.
September 1, 2016
German construction contract procedures (VOB) - Part C: General technical specifications in construction contracts (ATV) - Drilling works
This standard deals with the drilling of holes, irrespective of their type, depth or heading (orientation), in particular for  - geotechnical investigation and testing of ground and groundwater,...
August 1, 2015
German construction contract procedures (VOB) - Part C: General technical specifications in construction contracts (ATV) - Drilling works
This standard deals with the drilling of holes, irrespective of their type, depth or heading (orientation), in particular for - geotechnical investigation and testing of site and groundwater, water...
DIN 18301
September 1, 2012
German construction contract procedures (VOB) - Part C: General technical specifications in construction contracts (ATV) - Drilling works
This standard deals with the drilling of holes, irrespective of their heading (orientation), in soil or rock, for the purposes of - site and groundwater investigations, water extraction and...
April 1, 2010
German construction contract procedures (VOB) - Part C: General technical specifications in construction contracts (ATV) - Drilling work
A description is not available for this item.
October 1, 2006
Construction contract procedures (VOB) - Part C: General technical specifications in construction contracts (ATV) - Drilling work
A description is not available for this item.
December 1, 2002
Construction contract procedures (VOB) - Part C: General technical specifications in construction contracts (ATV); Drilling work
A description is not available for this item.
December 1, 2000
Construction contract procedures (VOB) - Part C: General technical specifications in construction contracts (ATV); Drilling work
A description is not available for this item.
June 1, 1996
Construction contract procedures (VOB) - Part C: General technical specifications in construction contracts (ATV) - Drilling work
A description is not available for this item.

References

Advertisement