NR/L2/TRK/001/MOD09
Inspection & Maintenance of Permanent Way: Loss of Rail Section
active, Most Current
Buy Now
| Organization: | NR |
| Publication Date: | 1 December 2012 |
| Status: | active |
| Page Count: | 18 |
scope:
This module of NR/L2/TRK/001 covers the following (as summarised in Table 1):
a) minimum rail depths;
b) measurement of sidewear and permitted limits and actions for sidewear;
c) gall;
d) rail depth (minimum rail strength analysis);
e) loss of rail foot;
f) inspections for rail corrosion and rail depth in level crossings and RRAPs;
g) use of coated rail and premium steel rail;
Document History
NR/L2/TRK/001/MOD09
December 1, 2012
Inspection & Maintenance of Permanent Way: Loss of Rail Section
This module of NR/L2/TRK/001 covers the following (as summarised in Table 1):
a) minimum rail depths;
b) measurement of sidewear and permitted limits and actions for sidewear;
c) gall;
d) rail...
June 2, 2012
Inspection & Maintenance of Permanent Way: Loss of Rail Section
This module of NR/L2/TRK/001 covers the following (as summarised in Table 1):
a) Minimum rail depths;
b) Measurement of sidewear and permitted limits and actions for sidewear;
c) Gall;
d) Rail...