This document is referenced by:
S1132 - Built Environment - Barriers and Fencing (Non-Lineside)
Published by LUL
on
October 1, 2022
This standard applies to new and altered pedestrian barriers and non-lineside fencing within London Underground operational, controlled property, including the parapet of any footbridge within a...
This document is referenced by:
R0049 - Maintenance Assurance Plan (Track) 2014-2015
Published by LUL
on
March 1, 2014
Purpose This Maintenance Assurance Plan (MAP) describes the arrangements for the assurance of London Underground BCV/JNP/SSL maintained Track assets. This plan also references the ongoing maintenance...
This document is referenced by:
G3201 - Maintaining plain line track
Published by LUL
on
March 1, 2014
This handbook covers the preparatory stages of identifying and planning maintenance work (section 4), the necessary safety and protection measures for work on and about the track (section 5) which...
This document is referenced by:
G3219 - Track handbook 19: Managing the critical aspects of track
Published by LUL
on
June 1, 2014
This handbook covers all parts of the track structure, both plain line and junctionwork, as well as lubricators, conductor rail, fencing, cleaning, speed restriction signs, structures, tunnel...
This document is referenced by:
S1027 - Site hoarding, fencing and barriers
Published by LUL
on
September 1, 2022
This standard applies to all works being undertaken by London Underground (LU) and / or their contractors or suppliers. It also applies to works being undertaken by Outside Parties (an entity as...