UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

MODUK - DEF STAN 00-970: PT 9: VOL 1

Flight Tests - Handling

active, Most Current
Organization: MODUK
Publication Date: 10 March 1998
Status: active
Page Count: 223
scope:

INTRODUCTION 

This Part states those tests which shall be made to demonstrate that the aeroplane can be controlled satisfactorily and is adequately stable in the air, and on the ground, in accordance with the requirements of Part 6. The tests of this Chapter are to be approved by the Aeroplane Project Director in conjunction with A 8 AEE.

Each chapter of this Part contains tests of the aeroplane under a specific fiight condition and is arranged in accordance with a standard layout, the paragraphs being grouped under headings in the following sequence :

(i) Object;

(ii) Relevant design requirements;

(iii) Applicability ;

(iv) Equipment; (VI Loading;

(vi) General test conditions;

viii) Tests;

Document History

DEF STAN 00-970: PT 9: VOL 1
March 10, 1998
Flight Tests - Handling
INTRODUCTION  This Part states those tests which shall be made to demonstrate that the aeroplane can be controlled satisfactorily and is adequately stable in the air, and on the ground, in...
December 1, 1994
Flight Tests - Handling
A description is not available for this item.
Flight Tests - Handling
A description is not available for this item.
November 1, 1990
Flight Tests - Handling
A description is not available for this item.

References

Advertisement