IEC 60076-7
Power transformers Part 7: Loading guide for oil-immersed power transformers
inactive
Buy Now
| Organization: | IEC |
| Publication Date: | 1 December 2005 |
| Status: | inactive |
| Page Count: | 122 |
| ICS Code (Transformers. Reactors): | 29.180 |
scope:
This part of IEC 60076 is applicable to oil-immersed transformers. It describes the effect of operation under various ambient temperatures and load conditions on transformer life.
NOTE For furnace transformers, the manufacturer should be consulted in view of the peculiar loading profile.
Document History
January 1, 2018
Power transformers – Part 7: Loading guide for mineral-oil-immersed power transformers
This part of IEC 60076 is applicable to mineral-oil-immersed transformers. It describes the effect of operation under various ambient temperatures and load conditions on transformer life.
NOTE For...
IEC 60076-7
December 1, 2005
Power transformers Part 7: Loading guide for oil-immersed power transformers
This part of IEC 60076 is applicable to oil-immersed transformers. It describes the effect of operation under various ambient temperatures and load conditions on transformer life.
NOTE For furnace...