This document references:
S1157 - Track – Performance, Design and Configuration
Published by LUL
on
March 1, 2023
This standard applies to all London Underground (LU) track including running lines depot track and sidings. The standard covers: a) principles for new designs of track components and configurations...
This document references:
S1156 - Gauging and Clearances
Published by LUL
on
August 1, 2021
This standard applies to all London Underground (LU) track including running lines depot track and sidings and to the vehicles that are approved to operate on this track. It applies to all platforms...
This document references:
S1157 - Track – Performance, Design and Configuration
Published by LUL
on
March 1, 2023
This standard applies to all London Underground (LU) track including running lines depot track and sidings. The standard covers: a) principles for new designs of track components and configurations...
This document references:
S1158 - Track – Inspection and Maintenance
Published by LUL
on
August 1, 2023
This standard applies to the Permanent Way system in running lines, depots and sidings. It covers, but is not limited to, the following components of track: a) running rails b) check rails c) rail...
This document references:
S1622 - Glossary of Terms and Abbreviations
Published by LUL
on
July 1, 2016
This Standard applies to all Category 1, 2 and 5 Standards and the Railway Safety Case (and successor documents). It applies to technical and financial documents where applicable and communications...
This document references:
T0436 - Weld Repair Of Plain Rails, Switches And Crossings
Published by LUL
on
April 1, 2022
This specification covers the requirements for the weld repair of the following: a) Plain running rails b) Switch rails c) Fabricated crossings d) Semi-welded crossings e) Cast crossings. More detail...
This document is referenced by:
G3201 - Maintaining plain line track
Published by LUL
on
March 1, 2014
This handbook covers the preparatory stages of identifying and planning maintenance work (section 4), the necessary safety and protection measures for work on and about the track (section 5) which...
This document is referenced by:
S1177 - Track - Managing temperaturedependent risk
Published by LUL
on
March 1, 2022
This standard applies to all LU staff responsible for the installation or maintenance of of track assets. It covers all ballasted flat bottom and bull head track Continuous Welded Rail (CWR), long...